OUR WORK

Fenson Contracting works with both public and private clients on municipal, residential, agricultural, commercial, and industrial projects.

CR 300 DRAINAGE IMPROVEMENTS

STORM SEWER

Project Highlights & Scope:

  • Misc. open ditch clearing/cleaning
  • 1,800 LF of 12” storm sewer installation
  • New headwall, (4) manholes, and (1) basin replacement
  • Relocate 15” concrete culvert
  • Jack & bore under CR 300

SANDUSKY AVE. IMPROVEMENTS

STREETS/ROADWAYS

Project Highlights & Scope:

  • Construct new 475’ long street, excavation, underdrains, subgrade prep, and aggregate base –
    prepare for asphalt paving

CULP DITCH

OPEN DITCH

Project Highlights & Scope:

  • 1,100 FT of open ditch clearing & reconstruction
  • Install culvert crossings, and rock chutes

RENNER DITCH

OPEN DITCH

Project Highlights & Scope:

  • Install 400 LF of 12” thru 30” HDPE pipe for storm sewer – some areas 10’ deep
  • Replace (2) existing catch basins and install (4) new catch basins
  • Replace (11) existing curb inlet castings w/new frame and grates – repair curb and asphalt
    around them
  • Brush clearing/disposal, excavation and grading of 1,800 LF of open ditch outlet
  • Pavement replacement, seeding, mulching and restoration

BEAVER CREEK

OPEN DITCH EROSION CONTROL

Project Highlights & Scope:

  • Haul & Place 9,000 ton of Type D Rip Rap
  • Haul & Place 14,100 ton of Type C Rip Rap

2017 VARIOUS STORM SEWER IMPROVEMENTS

STORM SEWER

separate project sites in one contract – one site subcontracted
Involves 6” thru 18” storm sewers – 2,300 LF total and 30 drainage structures – up to 10’ deep in
Market St. area w/numerous existing utilities

RUDOLPH FOODS DITCH

RETAINING WALL & OPEN DITCH

Project Highlights & Scope:

  • Construct a 62’ long x 8’ high redi-rock retaining wall
  • 1,000 LF of open ditch reconstruction with brush removal & disposal

LINN-HURT DITCH

STORM SEWER/TILE DITCH

Project Highlights & Scope:

  • Install approximately 5,400 LF of pipe ranging from 6” to 15”
  • Install 6 catch basins
  • Clean section of open ditch
  • Cast-in place concrete headwall

FORT JENNINGS STORM SEWER

STORM SEWER

Project Highlights & Scope:

  • Replace 1,200 LF section of failing 30” storm sewer
  • Remove & dispose of existing pipe
  • Ranged from 10-13’ deep

SUGAR CREEK

OPEN DITCH

Project Highlights & Scope:

  • Worked as a subcontractor to Tawa Tree Service
  • Reconstruct portions of Sugar Creek
  • Misc. ingress/egress clearing & grubbing for project access
  • Remove silt bars from the stream
  • Repair bank erosion by placing Type C rock

FORREST STREET

WATERLINE REPLACEMENT

Project Highlights & Scope:

  • 725’ of 6” waterline replacement – 140’ directional drill
  • Includes (2) hydrants, (3) valves, and 3” live tap
  • Install (3) new meter pits and residential tie-ins

MILEY DITCH - STAGE 2

DITCH RECONSTUCTION

Project Highlights & Scope:

  • First 2 stage ditch in Putnam County
  • Modify existing ditch into a 2 stage ditch – 2,900’ long
  • 7,500 CY of excavation & grading
  • Misc. tile outlets, rock chutes, seeding, etc.

LITTLE CRANKBERRY CREEK

OPEN DITCH

Project Highlights & Scope:

  • 1 mile of selective tree cutting & logjam removal
  • 2 miles of complete ditch reconstruction w/associated clearing & grubbing
  • 10,000 CY of excavating & grading
  • Reconstruction of two lateral ditches/roadside swale
  • Includes culverts, erosion control structures, rock placement, and seeding/mulching

CATON DITCH

OPEN DITCH

Project Highlights & Scope:

  • 2 miles of complete ditch reconstruction w/tree & brush removal
  • Reconstruction required the excavation of a maintenance bench to access the ditch due to the
    extreme width and depth of the channel
  • Includes logjam removal on the lower end
  • Approximately 20,000 CY of excavation & grading – 4.75 acres of seeding

WEBB RUN

OPEN DITCH

Project Highlights & Scope:

  • 1 mile of selective tree cutting & logjam removal
  • 2 miles of complete ditch reconstruction w/associated clearing & grubbing
  • 10,000 CY of excavating & grading
  • Reconstruction of two lateral ditches/roadside swale
  • Includes culverts, erosion control structures, rock placement, and seeding/mulching

STEINLE DITCH

NEW WATERWAY

Project Highlights & Scope:

  • Construct 4 acre waterway, complete with seed & mulch and erosion control blanket
  • 8,000 CY of excavating & grading
  • Haul & Place 110 ton of Type C rip rap
  • Install 43,200 SF of 16’ wide erosion control blanket

SCHIMMOELLER DITCH

OPEN DITCH

Project Highlights & Scope:

  • 1.5 miles of complete two sided ditch reconstruction
  • Excavation & Grading of 8,790 CY of material
  • Clean two culverts
  • Misc. Light Clearing
  • Remove Bridge Abutment
  • Seed & Mulch 2.7 acres of ditch bank

MILEY DITCH

OPEN DITCH

Project Highlights & Scope:

  • 3 Miles of Ditch Cleaning & Partial Reconstruction
  • Place 150 Ton of Type C Rock
  • Remove 40 logjams downstream for 2 miles
  • Seed & Mulch .75 acre of ditch bank

DUSTY ACRES DITCH

OPEN DITCH

Project Highlights & Scope:

  • 56,000 CY of Excavation & Grading
  • Clearing & Piling of 6 miles of heavy trees & brush
  • Grading across 50 acres of farm ground
  • Clean 11 culverts & bridges
  • Seed 20 acres of ditch bank
  • Misc. Tile Repairs & Extensions

ELLIS-MARCHAL DITCH

STORM SEWER/TITLE DITCH

Project Highlights & Scope:

  • 1,500 LF of 15” Storm Sewer
  • 600 LF of 24” Storm Sewer
  • Install 2 Catch Basins
  • Tie in new line to existing 18” clay tile
  • Make 15 submain connections into the new main
  • Final Grading, Seeding, & Restoration

FORT JENNINGS STATE BANK

BUILDING DEMOLITION & SITE PREP

We were fortunate to be the demolition subcontractor on this local project that involved complete
demolition and subsequent removal of the existing Fort Jennings State Bank. This bank was constructed
in 1970 by Nolan’s Grandpa Bill ‘Banker Bill’ Wildenhaus...

MOORE DITCH

NEW OPEN DITCH CONSTRUCTION

13,000 CY of Excavation & Grading
Grading 30 acres of farmground
Remove  & Dispose of 6,100 FT of Existing Clay Tile
Low Water Crossing
30 Tile Extensions
7 Acres of Seeding
4 Road Ditch Crossings...

GRESSEL DRIVE - WATERLINE

WATERLINE REPLACEMENT

Project Highlights & Scope:

  • Installation of 890 LF of C900 Waterline
  • (4) 45 Degree Bends
  • Pressure Test & Chlorinate the line
  • Expose, isolate, plug, and retest the line
  • Remove the plugs and reconnect to the existing lines using (3) solid sleeves

LAMB DITCH

STORM SEWER/TILE DITCH

Project Highlights & Scope:

  • 400 LF of 8” Storm Sewer
  • 335 LF of 15” Storm Sewer
  • Remove & Replace one Catch Basin
  • Install 2 new Catch Basins
  • Place 10 CY of Type C Rip Rap
  • Final Grading, Seeding, and Restoration
TOP