FORREST ST. WATERLINE REPLACEMENT

Project Value: $55,000
Owner: Village of Continental
Representative: Poggemeyer Design Group
Year: 2016
Location: Continental, OH
Project Highlights & Scope:

  • 725’ of 6” waterline replacement – 140’ directional drill
  • Includes (2) hydrants, (3) valves, and 3” live tap
  • Install (3) new meter pits and residential tie-ins

TOP